mywiki:sims_residences_council_notes
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| mywiki:sims_residences_council_notes [2026/01/19 13:00] – [Condo R&R cost from 2025-2026|] gshao | mywiki:sims_residences_council_notes [2026/01/19 16:50] (current) – [Service/Provider/Cost] gshao | ||
|---|---|---|---|
| Line 20: | Line 20: | ||
| - | | Items | Company | + | |
| - | | Cleaning Service | Kleematic management | | + | ======= Service/ |
| + | | Service | ||
| + | | MA | Absolut Properties Pte Ltd | $6,703.50 | | ||
| + | | Lift Maintenance | Kone | $6,630 before GST ? | $6,630 after xxx 2026, old contract: $9,346 | | ||
| + | | Security service | Suits Security Solutions Pte | $9701 | | | ||
| + | | Intercom | Icondo | $4,5000 | | | ||
| + | | R&R | LTC | $325,000 | R&R started from 2025 and completed on 2026 | | ||
| + | | R&R RTO | Htun Htun Win | | | ||
| + | | Cleaning Service | Kleematic management | ||
| + | | Legal consult | Lee & Lee LP \\ 25 North BridgeRoad level 7 \\ S179104 | | ||
| | Pest control | DUFT Pte LTD | | | Pest control | DUFT Pte LTD | | ||
| | swimming pool maintenance | TAS POOL MAINTENANCE AND SERVICES | | | swimming pool maintenance | TAS POOL MAINTENANCE AND SERVICES | | ||
| Line 27: | Line 36: | ||
| | security system cameral repair | G-NETWORKING(S) PTE. LTD. | | | security system cameral repair | G-NETWORKING(S) PTE. LTD. | | ||
| | blub/light | Longest Power | | | blub/light | Longest Power | | ||
| - | | Security guard | Suits security Solutions Pte ltd | | ||
| - | | Lift Maintenance | Kone Pte Ltd | | ||
| | Smoke detector | BS engineering Co Pte Ltd | | | Smoke detector | BS engineering Co Pte Ltd | | ||
| | Refuse removal | Cora Environment Pte Ltd | | | Refuse removal | Cora Environment Pte Ltd | | ||
| | auto gate, video intercom, card access | Sound & Vision Pte ltd | | | auto gate, video intercom, card access | Sound & Vision Pte ltd | | ||
| | water tank clean | Valent Engineering Pte Ltd | | | water tank clean | Valent Engineering Pte Ltd | | ||
| + | |||
| ====== Icondo Cost: ====== | ====== Icondo Cost: ====== | ||
| Line 46: | Line 54: | ||
| * Retention Sum: $32,500.00 (10%) | * Retention Sum: $32,500.00 (10%) | ||
| - | Name of RTO: Htun Htun Win | + | RTO: |
| + | * Name: Htun Htun Win | ||
| + | * Designation: | ||
| ====== Cleaner List 2026 ====== | ====== Cleaner List 2026 ====== | ||
| {{: | {{: | ||
| + | |||
| + | |||
| + | ======= Terms: ======= | ||
| + | | SSO | Senior Security Officer | | ||
mywiki/sims_residences_council_notes.1768798813.txt.gz · Last modified: by gshao
